"We are just your intermediary."
A Life for a Village Project Kenya (Project: 7)
A Life for a Village Project Kenya (Project: 7)

With your share of 5.000 TL, we are constructing Mosques and Water Wells in Africa, continuing the Ottoman tradition.

A Life for a Village Project Kenya (Project: 7)

"The Life for a Village Project" is a comprehensive development initiative implemented by Çare Derneği to improve living standards in villages in Africa that have difficulty accessing water. This project aims to meet both the physical and spiritual needs of the villagers by drilling deep water wells, building water storage tanks, fountains, mosques, tap points, WC and shower cabins, hafiz schools, and dining halls. This project, inspired by the Ottoman tradition, aims to leave lasting works that will continue as perpetual charity until the end of time.

Project Scope

Our project's primary target is villages in Africa that have difficulty accessing water. These villages face serious health and hygiene problems due to their distance from water sources and the inadequacy of existing water sources. Water scarcity leads to the spread of diseases, a decrease in agricultural productivity, and a decline in quality of life.

However, our project is not limited to meeting water needs but also undertakes significant work for the education and housing needs of orphaned children. We ensure that children grow up and receive education in a safe environment by building orphanages and hafiz schools in target areas. Additionally, we aim to strengthen social solidarity and spiritual bonds by constructing mosques and fountains. In summary, "A Life for a Village" projects aim to increase social welfare by supporting sustainable development in villages.

Works to Be Done

  1. First Phase
    • Deep Drilled Water Well: Deep drills will be conducted to provide long-lasting and continuous water.
    • Water Storage Tanks: Hygienic and enclosed tanks will be built.
    • Fountains: Multi-tap structures will be built near mosques.
    • Tap Points: Water will be transported to specific points within the village.
    • WC and Shower Cabins: Suitable structures for cleanliness and hygiene will be built.
  2. Second Phase
    • Mosque: Construction and renovation of the mosque to be used for worship, Quran education, and gatherings.
  3. Third Phase
    • Orphanage Hafiz School: Hafiz schools will be established for the education of orphaned children.
    • Dining Hall: A dining hall will be built for the villagers and students.

Financing and Cost

  • Flexible Amount: You can donate any amount you want.
  • Donation via SMS: Send "SU" to 3851 for a 30 TL donation

Project Duration

Construction and Implementation: It will be completed within 7-10 months after the donation is completed.